Two sites · Queensland · November 2026 · Confidential
Two data-centre campuses in Queensland. Each has power and water in place: supply that is not grid-dependent, recycled water, green backup.

Built in stages from 2027 to 2030. Site one, Stage 1 in 2027.
Site one
An industrial site with power and water connected. Four stages to 1.2 GW at the meter, the first earning in 2027.
Site two
A second site with power and water in place. Three stages to 1.2 GW at the meter, the first ready late 2028.
Firmed supply beside each campus, not drawn from the grid. Recycled water for cooling. Green generation on call as backup.
The locations, the partners, the structures and the detailed numbers are disclosed only inside the room, separately for each site, to named readers.
The parcel, the plan, what stands on it, the stages.
What is connected, what is contracted, what is a gate, who holds it.
Supply, price, the closed-loop design, volumes by stage.
Routes to the capitals and the cable landings, with times.
Three layers, who funds each, what the holding entity holds.
The planning path; what the counterparty keeps, recovers and earns.
From submission to first power and full build, with dependencies.
Every claim against its source; corrections and open items listed.
Access is issued personally. Enter the PIN you were given.
Every document reads under your name. Every page and every minute is logged. Nothing downloads.
Tell us who you are and we will come back to you.
This page and the room behind it describe a private opportunity. Access is granted to named individuals only. Every document in the room is issued to its reader personally, carries that reader's name on every page, and records each page opened and the time spent. Nothing may be copied, photographed, forwarded or disclosed to any other person without written consent.
Nothing on this page or in the room is an offer, an invitation to invest, financial product advice or a representation on which any person may rely. Figures are indicative and subject to confirmation. Information current at November 2026. By requesting or using access you accept these terms.