DCQ

Two sites · Queensland · November 2026 · Confidential

Power and water on site, connections in place. Nothing taken from the grid.

Two data-centre campuses in Queensland. Each has power and water in place: supply that is not grid-dependent, recycled water, green backup.

Campus impression at dusk

Built in stages from 2027 to 2030. Site one, Stage 1 in 2027.

No grid drainEach campus runs on firmed supply contracted. The grid carries no new load from the halls.
2 × 1.2 GWTwo campuses, each about 1 GW of IT load. 2.4 GW at the meter in all.
2027 → 2030Site one in four stages from 2027. Site two in three stages from 2028. Full build 2030.
Tier III designUptime Tier III-equivalent, concurrently maintainable.
About A$30 bnCapital to fully build in 2030, both sites.
About A$5 bn a yearRevenue a year at full build in 2030, both sites.
Over A$60 bnAsset value at full build in 2030, both sites.

Site one

Site one

An industrial site with power and water connected. Four stages to 1.2 GW at the meter, the first earning in 2027.

1.2 GW at the meterFour stagesFirmed supplyStage 1 in 2027

Site two

Site two

A second site with power and water in place. Three stages to 1.2 GW at the meter, the first ready late 2028.

1.2 GW at the meterThree stagesFirmed supplyStage 1 late 2028

Firmed supply beside each campus, not drawn from the grid. Recycled water for cooling. Green generation on call as backup.

The locations, the partners, the structures and the detailed numbers are disclosed only inside the room, separately for each site, to named readers.

Inside the room

Site and ground

The parcel, the plan, what stands on it, the stages.

Power and firming

What is connected, what is contracted, what is a gate, who holds it.

Water and cooling

Supply, price, the closed-loop design, volumes by stage.

Connectivity and latency

Routes to the capitals and the cable landings, with times.

Commercial model

Three layers, who funds each, what the holding entity holds.

Approvals and the counterparty

The planning path; what the counterparty keeps, recovers and earns.

Timeline

From submission to first power and full build, with dependencies.

Evidence file

Every claim against its source; corrections and open items listed.

Enter the room

Access is issued personally. Enter the PIN you were given.

Every document reads under your name. Every page and every minute is logged. Nothing downloads.

Request access

Tell us who you are and we will come back to you.

Confidential

This page and the room behind it describe a private opportunity. Access is granted to named individuals only. Every document in the room is issued to its reader personally, carries that reader's name on every page, and records each page opened and the time spent. Nothing may be copied, photographed, forwarded or disclosed to any other person without written consent.

Nothing on this page or in the room is an offer, an invitation to invest, financial product advice or a representation on which any person may rely. Figures are indicative and subject to confirmation. Information current at November 2026. By requesting or using access you accept these terms.